# H-ROLLER/1600/E6: client site prep before install callout - Source-Date (SAST): 2024-03-19 13:37; 220 V 2024-04-06 03:16; recirculated 2025-01-29 15:53 - From/To: April → sales / support - Dest: both - Review-after: 2027-08-31 - Status: current - Source: company email (Archives/Internal Affairs), 2024-03-19 / 2024-04-06 / 2025-01-29 ## Facts - Advise the client to have site prep ready before the tech callout for **H-ROLLER/1600/E6**. - 10 mm-thick 800×1760 mm flat tempered glass surface is **not** included; the client must prepare it. Sapwood is an acceptable temporary substitute. - Minimum 40 A circuit breaker. - 3-pin **220 V** industrial plug and socket. - 4.0 mm² to 6.0 mm² cable, minimum 5 metres, from the machine to that plug.