H-ROLLER/1600/E6 and E6P: client site prep before install callout Source-Date (SAST): 2024-09-04 23:13; recirculated 2025-01-29 15:53 Dest: both Review-after: 2027-08-31 Status: current Facts Have site prep ready before the tech callout for H-ROLLER/1600/E6 and H-ROLLER/1600/E6P. Single-phase 220 V; about 6 kW (18–55 A). Electric roller elements; about 35 minutes pre-heat. 10 mm-thick 800×1760 mm flat tempered glass is not included. Alternative: 6 mm-thick supawood 800×1760 mm. 130 g+ sublimation transfer paper for colour and wrinkle-free transfer. Electrician: 32 A 6 mm² cable (about 10 m), circuit breaker min 40 A, single-phase three-pin socket and plug. Cable not included with the crate.