# H-ROLLER/1600/E6 and E6P: client site prep before install callout - Source-Date (SAST): 2024-09-04 23:13; recirculated 2025-01-29 15:53 - Dest: both - Review-after: 2027-08-31 - Status: current ## Facts - Have site prep ready before the tech callout for **H-ROLLER/1600/E6** and **H-ROLLER/1600/E6P**. - Single-phase 220 V; about 6 kW (18–55 A). Electric roller elements; about 35 minutes pre-heat. - 10 mm-thick 800×1760 mm flat tempered glass is **not** included. Alternative: 6 mm-thick supawood 800×1760 mm. - 130 g+ sublimation transfer paper for colour and wrinkle-free transfer. - Electrician: 32 A **6 mm²** cable (about 10 m), circuit breaker **min 40 A**, single-phase three-pin socket and plug. Cable not included with the crate.